Wing Construction - page 1


5/27/00 - Start with the basic wing spar...

6/4/00 - ...add the D-section ribs and conduit to run wires...

6/8/00 - ...then attach the wing skins...

6/11/00 - ...and finally add the aft spar

10/29/00 - A view of the inside of the wing with the BID tapes added and fuel vent tube installed

11/19/00 - 2 of the 4 wing ribs added, and the aileron pushrod pass-thru tubes in place

5/11/01 - Wing ribs and aileron pushrod pass-thru tubes bonded in, holes for bellcrank brackets drilled, and fuel cap flanges glassed in

5/27/01 - Fuel pickup tube and strainers attached, installing mounting flanges for fuel drains

7/4/01 - Completed inspection panels for aileron actuator components

10/7/01 - Attached aileron ribs to upper aileron skins
Return to main page Wings, page 2