![]() 5/27/00 - Start with the basic wing spar... |
![]() 6/4/00 - ...add the D-section ribs and conduit to run wires... |
|
![]() 6/8/00 - ...then attach the wing skins... |
![]() 6/11/00 - ...and finally add the aft spar |
|
![]() 10/29/00 - A view of the inside of the wing with the BID tapes added and fuel vent tube installed |
![]() 11/19/00 - 2 of the 4 wing ribs added, and the aileron pushrod pass-thru tubes in place |
|
![]() 5/11/01 - Wing ribs and aileron pushrod pass-thru tubes bonded in, holes for bellcrank brackets drilled, and fuel cap flanges glassed in |
![]() 5/27/01 - Fuel pickup tube and strainers attached, installing mounting flanges for fuel drains |
|
![]() 7/4/01 - Completed inspection panels for aileron actuator components |
![]() 10/7/01 - Attached aileron ribs to upper aileron skins |