Name: Chang-Diaz, Franklin Country: USA M/F: M Number of Flights: 7

Space Flights Launch Date - Shuttle Landing Date - Shuttle
1. STS-61C January 12, 1986 - Columbia January 18, 1986 - Columbia
2. STS-34 October 18, 1989 - Atlantis October 23, 1989 - Atlantis
3. STS-46 July 31, 1992 - Atlantis August 8, 1992 - Atlantis
4. STS-60 February 3, 1994 - Discovery February 11, 1994 - Discovery
5. STS-75 February 22, 1996 - Columbia March 9, 1996 - Columbia
6. STS-91 June 2, 1998 - Discovery June 12, 1998 - Discovery
7. STS-111 June 5, 2002 - Endeavour June 19, 2002 - Endeavour

Space Flights Descriptions
1. STS-61C Deployed RCA SATCOM Ku-1 for RCA Americom
2. STS-34 Deployed Galileo Jupiter orbiter spacecraft
3. STS-46 Deployed ESA's European Retrievable Carrier (EURECA)
Deployed the US/Italian Tethered Satellite System 1 (TSS-1) - Tether jammed at 840 feet preventing the planned deployment of a tethered satellite at 12.5 miles.
4. STS-60 Spacehab Mission 2
Deployed and retrieved the Wake Shield Facility 1 (WSF-1)
5. STS-75 United States Microgravity Payload 3 (USMP-3)
Deployed the US/Italian Tethered Satellite System 1R (TSS-1R) - Tether snapped just short of the full deployment of 12.8 miles.
6. STS-91 Shuttle-Mir Docking Mission 9 - ISS Program Phase I is complete
Discovery docked with Mir from June 4, 1998 to June 8, 1998.
7. STS-111 ISS Utilization Flight UF-2
Delivered the Mobile Base System on June 10, 2002 and supplies in the Leonardo Multi-Purpose Logistics Module - Endeavour docked with the International Space Station (ISS) from June 7, 2002 to June 15, 2002.

Spacewalks - 3
Space Flights Date & Duration Purpose
STS-111 June 9, 2002 International Space Station Assembly - Attach a Power and Data Grapple Fixture to the P6 Truss Segment. Store six micrometeoroid debris shields on Pressurized Mating Adapter-1. Remove thermal blankets from the Mobile Base System. Inspect failed Control Movement Gyro-1
7 hours 14 minutes
STS-111 June 11, 2002 International Space Station Assembly - Perform tasks to install the Mobile Base System on the Mobile Transporter
5 hours 0 minutes
STS-111 June 13, 2002 International Space Station Assembly - Replace the wrist roll joint on the International Space Station's robotic arm
7 hours 17 minutes

Return to Master List American Astronauts Spacewalkers Shuttle-Mir Program - 1998
Space Shuttle Program - 1986 / 1989 / 1992 / 1994 / 1996 Seven Spaceflights
International Space Station Program - Phase III - 2002

Updated - June 4, 2006