Name: Fossum, Michael Country: USA M/F: M Number of Flights: 2

Space Flights Launch Date - Shuttle Landing Date - Shuttle
1. STS-121 July 4, 2006 - Discovery July 17, 2006 - Discovery
2. STS-124 February 2008 - Atlantis February 2008 - Atlantis

Space Flights Descriptions
1. STS-121 ISS Utilization and Logistics Flight ULF-1.1
Deliver supplies in the Leonardo Multi-Purpose Logistics Module, and perform other tasks left from the STS-114 mission - Discovery docked with the International Space Station (ISS) from July 6, 2006 to July 15, 2006.
2. STS-124 ISS Assembly Mission 1J/A (Scheduled)
Deliver the Kibo Experiment Module.

Spacewalks - 3
Space Flights Date & Duration Purpose
STS-121 July 8, 2006 International Space Station Assembly - Test the ability of the 50-foot Orbiter Boom Sensor System to support astronauts as a work platform. Replace the zenith Integrated Umbilical Assembly on the Mobile Transporter
7 hours 31 minutes
STS-121 July 10, 2006 International Space Station Assembly - Replace the Trailing Umbilical System on the Mobile Transporter. Install a spare pump module on External Stowage Platform 2
6 hours 47 minutes
STS-121 July 12, 2006 International Space Station Assembly - Test heat shield repair methods
7 hours 11 minutes

Return to Master List American Astronauts Two Spaceflights Spacewalkers
International Space Station Program - Phase III - 2006 / Scheduled

Updated - March 21, 2007