| Name: Jones, Thomas | Country: USA | M/F: M | Number of Flights: 4 |
| Space Flights | Launch Date - Shuttle | Landing Date - Shuttle |
|---|---|---|
| 1. STS-59 | April 9, 1994 - Endeavour | April 20, 1994 - Endeavour |
| 2. STS-68 | September 30, 1994 - Endeavour | October 11, 1994 - Endeavour |
| 3. STS-80 | November 19, 1996 - Columbia | December 7, 1996 - Columbia |
| 4. STS-98 | February 7, 2001 - Atlantis | February 20, 2001 - Atlantis |
| Space Flights | Descriptions |
|---|---|
| 1. STS-59 | Space Radar Laboratory Mission 1 (SRL-1) |
| 2. STS-68 | Space Radar Laboratory Mission 2 (SRL-2) |
| 3. STS-80 | Deployed and retrieved Orbiting and Retrievable Far and Extreme Ultraviolet
Spectrometer on the Shuttle Pallet Satellite II (ORFEUS/SPAS-II) Deployed and retrieved Wake Shield Facility 3 (WSF-3) - Tamara Jernigan and Thomas Jones had two planned spacewalks cancelled due to Columbia's stuck airlock hatch. |
| 4. STS-98 | ISS Assembly Mission 5A Delivered the U.S. Destiny Laboratory on February 10, 2001 - Atlantis docked with the International Space Station (ISS) from February 9, 2001 to February 16, 2001. |
| Spacewalks - 3 | ||
| Space Flights | Date & Duration | Purpose |
|---|---|---|
| STS-98 | February 10, 2001 | International Space Station Assembly - Attach Pressurized Mating Adapter 2 to Z-1 Truss Segment for temporary storage. Prepare Destiny Laboratory for installation to the International Space Station. Connect data, electrical, cooling lines between Destiny and the Z-1 Truss Segment |
| 7 hours 34 minutes | ||
| STS-98 | February 12, 2001 | International Space Station Assembly - Relocate Pressurized Mating Adapter 2 to the end of the Destiny Laboratory. Connect cable between Pressurized Mating Adapter 2 and Destiny. Install Power and Data Grapple Fixture on Destiny. Install shutter to Destiny's window. Perform miscellaneous tasks on Destiny's exterior |
| 6 hours 50 minutes | ||
| STS-98 | February 14, 2001 | International Space Station Assembly - Attach spare S-Band communications antenna to the Z-1 Truss Segment. Double-check connections between Destiny and Pressurized Mating Adapter 2. Release a cooling radiator on the P6 Truss Segment. Inspect solar array connections at the top of the station. Test the ability of a spacewalker to carry an immobile crew member back to the shuttle airlock |
| 5 hours 25 minutes | ||
| Return to Master List | Four Spaceflights | Space Shuttle Program - 1994 / 1996 |
| American Astronauts | Spacewalkers | |
| International Space Station Program - Phase II - 2001 | ||
Updated - June 6, 2006