Name: Massimino, Michael Country: USA M/F: M Number of Flights: 2

Space Flights Launch Date - Shuttle Landing Date - Shuttle
1. STS-109 March 1, 2002 - Columbia March 12, 2002 - Columbia
2. STS-125 September 2008 - Atlantis September 2008 - Atlantis

Space Flights Descriptions
1. STS-109 Hubble Space Telescope Service Mission 3B (HST-SM 3B)
2. STS-125 Hubble Space Telescope Service Mission 4 (HST-SM 4) (Scheduled)

Spacewalks - 2
Space Flights Date & Duration Purpose
STS-109 March 5, 2002 Repair Hubble Space Telescope - Replace old port solar array with new third-generation solar array. Replace associated Diode Box Assembly with port solar array. Replace reaction wheel assembly unit
7 hours 16 minutes
STS-109 March 7, 2002 Repair Hubble Space Telescope - Replace Faint Object Camera with Advanced Camera for Surveys. Install Electronic Support Module. Finish cleanup tasks from Power Control Unit installation
7 hours 30 minutes

Return to Master List Two Spaceflights Spacewalkers
American Astronauts Space Shuttle Program - 2002 / Scheduled

Updated - January 10, 2007