Name: McArthur, William Country: USA M/F: M Number of Flights: 4

Space Flights Launch Date - Shuttle Landing Date - Shuttle
1. STS-58 October 18, 1993 - Columbia November 1, 1993 - Columbia
2. STS-74 November 12, 1995 - Atlantis November 20, 1995 - Atlantis
3. STS-92 October 11, 2000 - Discovery October 24, 2000 - Discovery
Space Flights Launch Date - Flight Up Landing Date - Flight Down
4. ISS Crew 12 October 1, 2005 - Soyuz TMA-7 April 8, 2006 - Soyuz TMA-7

Space Flights Descriptions
1. STS-58 Spacelab Life Sciences Mission 2 (SLS-2)
2. STS-74 Shuttle-Mir Docking Mission 2
Delivered the Docking Module to Mir on November 15, 1995
Atlantis undocked from Mir on November 18, 1995.
3. STS-92 ISS Assembly Mission 3A
Delivered the Z1 Truss Segment on October 14, 2000 and PMA-3 on October 16, 2000 - Discovery docked with the International Space Station (ISS) from October 13, 2000 to October 20, 2000.
ISS Crew 8A
(Cancelled)
ISS "Alpha" Expedition Crew 8A
Following the loss of Columbia, the original crew was replaced by the two person "caretaker" crew of Michael Foale and Aleksandr Kaleri.
ISS Crew 8
(Backup Crew)
ISS "Alpha" Expedition "Caretaker" Crew 8
ISS Crew 9B
(Cancelled)
ISS "Alpha" Expedition "Caretaker" Crew 9B
William McArthur left the ISS Crew 9B due to a temporary medical problem in January 2004, and was replaced by Leroy Chiao. The new crew was replaced by Michael Fincke and Gennadi Padalka after "psychological compatibility" problems emerged between Chiao and Valeri Tokarev.
ISS Crew 10
(Backup Crew)
ISS "Alpha" Expedition "Caretaker" Crew 10
4. ISS Crew 12 ISS "Alpha" Expedition Crew 12 (ISS Crew Transfer Flight 11S)
Docked with the International Space Station (ISS) on October 3, 2005 aboard Soyuz TMA-7
Returned to Earth aboard Soyuz TMA-7 on April 8, 2006

Spacewalks - 4
Space Flights Date & Duration Purpose
STS-92 October 15, 2000 International Space Station Assembly - Relocate S-Band Antenna Support Assembly to Z1 Truss Segment. Install the port Extravehicular Tool Storage Device on the Z1 Truss Segment. Connect cables between the Unity module and the Z1 Truss Segment. Install and deploy the Space-to-Ground Antenna dish
6 hours 28 minutes
STS-92 October 17, 2000 International Space Station Assembly - Install two DC-to-DC Converter Unit-Heat Pipes on the Z1 Truss Segment, and the starboard Extravehicular Tool Storage Device on the Z1 Truss Segment
6 hours 48 minutes

ISS Crew 12 November 7, 2005 International Space Station Assembly - Install a camera group on the P1 Truss Segment. Remove a failed Rotary Joint Motor Controller from the P1 Truss Segment. Toss into space the Floating Potential Probe. Replace a failed circuit breaker on the Mobile Transporter
5 hours 22 minutes
ISS Crew 12 February 3, 2006 International Space Station Assembly - Move a cargo crane adapter. Collect science experiments from the hull of the Zvezda Service Module. Manually launch SuitSat - an expired Russian spacesuit equipped with amateur radio equipment. Secure a cable cutter on the Mobile Transporter
5 hours 43 minutes

Return to Master List Four Spaceflights Space Shuttle Program - 1993
American Astronauts Spacewalkers Shuttle-Mir Program - 1995
Foreign Cosmonauts launched by Russia
International Space Station Program - Phase II - 2000 / Phase III - 2005 / Exp.-Crew

Updated - September 19, 2006