| Name: Seller, Piers | Country: USA | M/F: M | Number of Flights: 2 |
| Space Flights | Launch Date - Shuttle | Landing Date - Shuttle |
|---|---|---|
| 1. STS-112 | October 7, 2002 - Atlantis | October 18, 2002 - Atlantis |
| 2. STS-121 | July 4, 2006 - Discovery | July 17, 2006 - Discovery |
| Space Flights | Descriptions |
|---|---|
| 1. STS-112 | ISS Assembly Mission 9A Delivered the S1 Truss Segment on October 10, 2002 - Atlantis docked with the International Space Station (ISS) from October 9, 2002 to October 16, 2002. |
| 2. STS-121 | ISS Utilization and Logistics Flight ULF-1.1 Deliver supplies in the Leonardo Multi-Purpose Logistics Module, and perform other tasks left from the STS-114 mission - Piers Seller replaced Carlos Noriega due to a temporary medical problem. - Discovery docked with the International Space Station (ISS) from July 6, 2006 to July 15, 2006. |
| STS-120 (Original Crew) |
ISS Assembly Mission 10A The goal was to deliver Node 2 to the International Space Station (ISS). Piers Seller was a member of the original STS-120 crew, and was transferred to the STS-121 mission. |
| Spacewalks - 6 | ||
| Space Flights | Date & Duration | Purpose |
|---|---|---|
| STS-112 | October 10, 2002 | International Space Station Assembly - Connect power, data and fluid lines between the S1 and S0 Truss Segments. Install new S-band antenna and first set of external cameras. Release launch restraints |
| 7 hours 1 minute | ||
| STS-112 | October 12, 2002 | International Space Station Assembly - Connect ammonia cooling lines. Prepare the Crew and Equipment Translation Aid cart for future use. Install Spool Positioning Devices, and additional set of external cameras on the Destiny Laboratory |
| 6 hours 4 minutes | ||
| STS-112 | October 14, 2002 | International Space Station Assembly - Remove a bolt preventing activation of a cable cutter on the Mobile Transporter. Connect ammonia lines between the S1 and S0 Truss Segments. Install additional Spool Positioning Devices |
| 6 hours 36 minutes | ||
|
|
||
| STS-121 | July 8, 2006 | International Space Station Assembly - Test the ability of the 50-foot Orbiter Boom Sensor System to support astronauts as a work platform. Replace the zenith Integrated Umbilical Assembly on the Mobile Transporter |
| 7 hours 31 minutes | ||
| STS-121 | July 10, 2006 | International Space Station Assembly - Replace the Trailing Umbilical System on the Mobile Transporter. Install a spare pump module on External Stowage Platform 2 |
| 6 hours 47 minutes | ||
| STS-121 | July 12, 2006 | International Space Station Assembly - Test heat shield repair methods |
| 7 hours 11 minutes | ||
| Return to Master List | American Astronauts | Spacewalkers | Two Spaceflights |
| International Space Station Program - Phase III - 2002 / Phase III - 2006 | |||
Updated - July 12, 2006