| Name: Soloviyov, Anatoli | Country: Soviet Union | M/F: M | Number of Flights: 5 |
| Space Flights | Launch Date - Flight Up | Landing Date - Flight Down |
|---|---|---|
| 1. Soyuz TM-5 | June 7, 1988 - Soyuz TM-5 | June 17, 1988 - Soyuz TM-4 |
| 2. Soyuz TM-9 | February 11, 1990 - Soyuz TM-9 | August 9, 1990 - Soyuz TM-9 |
| 3. Soyuz TM-15 | July 27, 1992 - Soyuz TM-15 | February 1, 1993 - Soyuz TM-15 |
| 4. Mir EO-19 Crew | June 27, 1995 - STS-71 (Atlantis) | September 11, 1995 - Soyuz TM-21 |
| 5. Soyuz TM-26 | August 5, 1997 - Soyuz TM-26 | February 19, 1998 - Soyuz TM-26 |
| Space Flights | Descriptions |
|---|---|
| Soyuz T-15A (Cancelled) |
Proposed Prime Crew Final expedition to Salyut 7 station was cancelled when control was lost |
| Soyuz T-15B (Cancelled) |
Proposed Backup Crew for second mission to operate TKS-3 military experiments
aboard the Salyut 7 space station Cancelled when control of Salyut 7 was lost |
| Soyuz T-15C (Cancelled) |
Proposed Backup Crew to All-Female Crew to Mir Cancelled due to several reasons (breakdown of Salyut 7, official resistance, etc.) |
| Soyuz T-15 (2nd Backup Crew) |
Mir Main Expedition EO-01 Crew & Salyut 7 Principal Expedition EO-06
Crew Left Mir from May 4, 1986 and transferred to Salyut 7 on May 5, 1986 Completed experiments left by the last Salyut 7 crew Left Salyut 7 on June 25, 1986 and returned to Mir on June 26, 1986 |
| Soyuz TM-3 (Backup Crew) |
Mir Visiting Expedition EP-01 Crew |
| 1. Soyuz TM-5 | Mir Visiting Expedition EP-02 Crew Docked with Mir on June 9, 1988 aboard Soyuz TM-5 Returned to Earth on June 17, 1988 aboard Soyuz TM-4 |
| Soyuz TM-7 (2nd Backup Crew) |
Mir Main Expedition EO-04 Crew |
| Soyuz TM-8 (Backup Crew) |
Mir Main Expedition EO-05 Crew |
| 2. Soyuz TM-9 | Mir Main Expedition EO-06 Crew Docked with Mir from February 13, 1990 to August 9, 1990 |
| Soyuz TM-14A (Cancelled) |
Original Backup Crew assigned to Soyuz TM-14 Soyuz TM-13 and Soyuz TM-14 crews were reshuffled extensively due to commercial bookings by Austria and Germany and the necessity of flying a Kazakh-born cosmonaut as part of the Baikonur rental agreement. |
| Soyuz TM-14 (Backup Crew) |
Mir Main Expedition EO-11 Crew |
| 3. Soyuz TM-15 | Mir Main Expedition EO-12 Crew Docked with Mir from July 29, 1992 to February 1, 1993 |
| Mir EO-18 Crew (Backup Crew) |
Mir Main Expedition EO-18 Crew (Shuttle-Mir Docking Mission 1) |
| 4. Mir EO-19 Crew | Mir Main Expedition EO-19 Crew (Shuttle-Mir Docking Mission 1) Docked with Mir on June 29, 1995 aboard Atlantis as part of the STS-71 crew Returned to Earth on September 11, 1995 aboard Soyuz TM-21 |
| 5. Soyuz TM-26 | Mir Main Expedition EO-24 Crew Docked with Mir from August 7, 1997 to February 19, 1998 |
| Spacewalks - 16 | ||
| Space Flights | Date & Duration | Purpose |
|---|---|---|
| Soyuz TM-9 | July 17, 1990 | Repair damaged thermal blankets on Soyuz TM-9 |
| 7 hours 0 minutes | ||
| Soyuz TM-9 | July 25, 1990 | Investigate damaged Kvant 2 hatch - attempted to close and seal |
| 3 hours 31 minutes | ||
|
|
||
| Soyuz TM-15 | September 3, 1992 | Prepare worksite for VDU thruster package installation atop Sofora truss |
| 3 hours 56 minutes | ||
| Soyuz TM-15 | September 7, 1992 | Install VDU thruster package atop Sofora truss |
| 5 hours 8 minutes | ||
| Soyuz TM-15 | September 11, 1992 | Install VDU thruster package atop Sofora truss |
| 5 hours 44 minutes | ||
| Soyuz TM-15 | September 15, 1992 | Retrieve space exposure samples. Move Kurs unit on Kristall |
| 3 hours 33 minutes | ||
|
|
||
| Mir EO-19 Crew | July 14, 1995 | Inspect -Z port. Manually deploy malfunctioning Spektr solar array |
| 5 hours 34 minutes | ||
| Mir EO-19 Crew | July 19, 1995 | Install Mir Infrared Atmospheric Spectrometer (infrared spectrometer). Retrieve TREK (space particle collector) detector |
| 3 hours 8 minutes | ||
| Mir EO-19 Crew | July 21, 1995 | Install Mir Infrared Atmospheric Spectrometer (infrared spectrometer) |
| 5 hours 35 minutes | ||
|
|
||
| Soyuz TM-26 | August 22, 1997 | Connect Spektr power cables. Surveyed interior of depressurized Spektr module. Retrieve equipment and belongings from module |
| 3 hours 16 minutes | ||
| Soyuz TM-26 | September 5, 1997 | Inspect exterior of Spektr. Move solar arrays |
| 6 hours 0 minutes | ||
| Soyuz TM-26 | October 20, 1997 | Install new hatch to reconnect Spektr solar array cables with Mir power bus |
| 6 hours 38 minutes | ||
| Soyuz TM-26 | November 3, 1997 | Remove old solar array from Kvant module |
| 6 hours 4 minutes | ||
| Soyuz TM-26 | November 6, 1997 | Install new solar array on Kvant module |
| 6 hours 12 minutes | ||
| Soyuz TM-26 | January 9, 1998 | Recover equipment. Begin repairs on leaky Kvant 2 airlock |
| 3 hours 6 minutes | ||
| Soyuz TM-26 | January 14, 1998 | Inspect station exterior |
| 3 hours 52 minutes | ||
| Return to Master List | Spacewalkers | Five Spaceflights |
| Soviet Cosmonauts launched by USA | ||
| Soviet Cosmonauts | Mir Program - 1988 / 1990 / 1992 | |
| Shuttle-Mir Program - 1995 / 1997 / Backup Crew | ||
Updated - June 10, 2006