| Name: Tanner, Joseph | Country: USA | M/F: M | Number of Flights: 4 |
| Space Flights | Launch Date - Shuttle | Landing Date - Shuttle |
|---|---|---|
| 1. STS-66 | November 3, 1994 - Atlantis | November 14, 1994 - Atlantis |
| 2. STS-82 | February 11, 1997 - Discovery | February 21, 1997 - Discovery |
| 3. STS-97 | December 1, 2000 - Endeavour | December 11, 2000 - Endeavour |
| 4. STS-115 | September 9, 2006 - Atlantis | September 21, 2006 - Atlantis |
| Space Flights | Descriptions |
|---|---|
| 1. STS-66 | Atmospheric Laboratory for Applications and Science Mission 3 (ATLAS-3) Deployed and retrieved Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet Satellite I (CRISTA/SPAS-I) |
| 2. STS-82 | Hubble Space Telescope Service Mission 2 (HST-SM 2) |
| 3. STS-97 | ISS Assembly Mission 4A Delivered the P6 Truss Segment on December 3, 2000 - Endeavour docked with the International Space Station (ISS) from December 2, 2000 to December 9, 2000. |
| 4. STS-115 | ISS Assembly Mission 12A Delivered the P3/P4 Truss Segments on September 12, 2006 - Atlantis docked with the International Space Station (ISS) from September 11, 2006 to September 17, 2006. |
| Spacewalks - 7 | ||
| Space Flights | Date & Duration | Purpose |
|---|---|---|
| STS-82 | February 14, 1997 | Repair Hubble Space Telescope - Replace Fine Guidance Sensor and a failed engineering and science tape recorder. Install optical control electronics enhancement kit |
| 7 hours 27 minutes | ||
| STS-82 | February 16, 1997 | Repair Hubble Space Telescope - Replace Solar Array Drive Electronics and magnetometer covers. Install thermal blankets |
| 6 hours 34 minutes | ||
|
|
||
| STS-97 | December 3, 2000 | International Space Station Assembly - Attach P6 Truss Segment to Z1 Truss Segment. Prepare solar arrays for deployment. Prepare radiator for power system deployment |
| 7 hours 33 minutes | ||
| STS-97 | December 5, 2000 | International Space Station Assembly - Connect cables between P6 Truss Segment and Unity Module. Position the S-band antenna for use by space station. Prepare the station for the arrival of the US Destiny Laboratory |
| 6 hours 37 minutes | ||
| STS-97 | December 7, 2000 | International Space Station Assembly - Install Floating Potential Probe. Conduct repair work to increase tension in the starboard solar arrays |
| 5 hours 10 minutes | ||
|
|
||
| STS-115 | September 12, 2006 | International Space Station Assembly - Connect power and data cables between P3 Truss Segment and P1 Truss Segment. Prepare solar arrays for deployment. Start work to activate Solar Alpha Rotary Joint |
| 6 hours 26 minutes | ||
| STS-115 | September 15, 2006 | International Space Station Assembly - Replace the S-Band Subassembly Antenna. Retrieve the Materials International Space Station Experiment Panel 5 from the P6 Truss Segment. Prepare radiator for deployment |
| 6 hours 42 minutes | ||
| Return to Master List | American Astronauts | Four Spaceflights | Spacewalkers |
| Space Shuttle Program - 1994 / 1997 | International Space Station Program - Phase II - 2000 / Phase III - 2006 | ||
Updated - September 20, 2006