| Name: Williams, Jeffrey | Country: USA | M/F: M | Number of Flights: 2 |
| Space Flights | Launch Date - Shuttle | Landing Date - Shuttle |
|---|---|---|
| 1. STS-101 | May 19, 2000 - Atlantis | May 29, 2000 - Atlantis |
| Space Flights | Launch Date - Flight Up | Landing Date - Flight Down |
| 2. ISS Crew 13 | March 30, 2006 - Soyuz TMA-8 | September 29, 2006 - Soyuz TMA-8 |
| Space Flights | Descriptions |
|---|---|
| STS-101A (Cancelled) |
Planned ISS Outfitting Flight 2A.2 mission Planned mission to outfit the Zvezda Service Module, split into two missions after delays of the launch of the Zvezda Service Module. |
| 1. STS-101 | ISS Maintenance Flight 2A.2a Prepare the Zarya FGB module for the arrival of the Zvezda Service Module - Atlantis docked with the International Space Station (ISS) from May 21, 2000 to May 26, 2000. |
| ISS Crew 10A (Cancelled) |
ISS "Alpha" Expedition Backup Crew 10A Following the loss of Columbia, the original prime crew was replaced by the two person "caretaker" prime crew of Leroy Chiao and Salizhan Sharipov. |
| ISS Crew 12 (Backup Crew) |
ISS "Alpha" Expedition Crew 12 |
| 2. ISS Crew 13 | ISS "Alpha" Expedition Crew 13 (ISS Crew Transfer Flight 12S) Docked with the International Space Station (ISS) on April 1, 2006 aboard Soyuz TMA-8 Returned to Earth aboard Soyuz TMA-8 on September 29, 2006 |
| Spacewalks - 3 | ||
| Space Flights | Date & Duration | Purpose |
|---|---|---|
| STS-101 | May 22, 2000 | International Space Station Assembly - Complete assembly of Russian Strela crane. Replace early communications antenna. Install hand rails, and TV cable. Reseat American Orbital Transfer Crane |
| 6 hours 44 minutes | ||
|
|
||
| ISS Crew 13 | June 1, 2006 | International Space Station Assembly - Install a replacement Elektron vent nozzle (hydrogen relief value). Retrieve Biorisk container, Kromka 3 experiment, and Pressure Control and Exposure Monitor Sensor. Replace camera on the Mobile Base System |
| 6 hours 31 minutes | ||
| ISS Crew 13 | August 3, 2006 | International Space Station Assembly - Install the Floating Potential Measurement Unit, two Materials on International Space Station Experiment panels, a floodlight, and a new value on the Destiny Laboratory. Replace a rotary joint motor controller, and computer on the thermal control system. Relocated equipment for the STS-115 spacewalks |
| 5 hours 54 minutes | ||
| Return to Master List | American Astronauts | Two Spaceflights |
| Foreign Cosmonauts launched by Russia | Spacewalkers | |
| International Space Station Program - Phase II - 2000 / Phase III - 2006 / Exp.-Crew | ||
Updated - March 9, 2007