| Spacewalks - 4 |
| Space Flights |
Date & Duration |
Purpose |
| ISS Crew 14 |
December 16, 2006 |
International Space Station Assembly - Rewire electric channels 1/4. Transfer
three Service Module Debris Panels to Pressurized Mating Adapter 3. Inspect
the port solar array of the P6 Truss Segment |
| 7 hours 31 minutes |
| ISS Crew 14 |
January 31, 2007 |
International Space Station Assembly - Reconfigure Loop A of the thermal
control system. Install power cables for the Station/Shuttle Power Transfer
System on the Z1 Truss Segment. Help with the retraction of starboard radiator
on the P6 Truss Segment. Disconnect one of two fluid lines to the Early
Ammonia Servicer |
| 7 hours 55 minutes |
| ISS Crew 14 |
February 4, 2007 |
International Space Station Assembly - Reconfigure Loop B of the thermal
control system. Install power cables for the Station/Shuttle Power Transfer
System on the Destiny Laboratory and Pressurized Mating Adapter 2. Help
with the retraction of the aft radiator on the P6 Truss Segment. Disconnect
the second fluid line to the Early Ammonia Servicer. Photograph the starboard
solar array on the P6 Truss Segment to help finalize plans for its retraction
during the STS-117 mission |
| 7 hours 11 minutes |
| ISS Crew 14 |
February 8, 2007 |
International Space Station Assembly - Install an Unpressurized Cargo Carrier
Assembly Attachment System on the upper face of the P3 Truss Segment. Remove
thermal shrouds from the P3 Truss Segment. Install power cables for the
Station/Shuttle Power Transfer System. Remove launch locks from the P5
Truss Segment to prepare for the relocation of the P6 Truss Segment during
the STS-120 mission |
| 6 hours 40 minutes |